Comprehensive Risk Assessment of Highway Hub Bridge Construction Based on Game Theory and Two-dimensional Cloud Model: Anren Hub Ramp Bridge B

You-zhi WANG , Yi-ming WANG , Mei-ling ZHUANG , Heng ZHANG , Ai-chen AN , Zi YE , Guang-dong BAO

Science Technology and Engineering ›› 2026, Vol. 26 ›› Issue (23) : 10123 -10132.

PDF
Science Technology and Engineering ›› 2026, Vol. 26 ›› Issue (23) : 10123-10132 DOI: 10.12404/j.issn.1671-1815.2505672
research-article
Comprehensive Risk Assessment of Highway Hub Bridge Construction Based on Game Theory and Two-dimensional Cloud Model: Anren Hub Ramp Bridge B
Author information +
History +
PDF

Abstract

With the continuous expansion of the bridge construction scale and the increasing complexity of the structural form and construction process, the risk factors encountered during the construction process are becoming increasingly diverse and exhibit strong fuzzy and random characteristics. To effectively address the uncertainty in risk assessment, a comprehensive assessment method for bridge construction risk was proposed by integrating game theory and the two-dimensional cloud model. Risk factors were first identified by fishbone diagram analysis. An indicator system consisting of 5 primary indicators and 15 secondary indicators was constructed. Then, Hierarchical analysis and entropy weighting were used to determine the subjective and objective weights. Game theory was used to optimize the combination of subjective and objective weights. Later, the risk assessment model was constructed based on the two-dimensional cloud theory. The risk level was determined by calculating the proximity degree. Finally, the Anren Hub Bridge project was taken as an example for empirical analysis. The assessment results indicate that the construction risk level is “large risk”, in which the construction organization and human factors are the key risk factors. This method proposed can effectively deal with the uncertainty problem in risk assessment and provide scientific basis for bridge construction safety management.

Graphical abstract

Keywords

bridge construction / risk assessment / game theory / two-dimensional cloud model / analytic hierarchy process / entropy weight method

Cite this article

Download citation ▾
You-zhi WANG, Yi-ming WANG, Mei-ling ZHUANG, Heng ZHANG, Ai-chen AN, Zi YE, Guang-dong BAO. Comprehensive Risk Assessment of Highway Hub Bridge Construction Based on Game Theory and Two-dimensional Cloud Model: Anren Hub Ramp Bridge B. Science Technology and Engineering, 2026, 26(23): 10123-10132 DOI:10.12404/j.issn.1671-1815.2505672

登录浏览全文

4963

注册一个新账户 忘记密码

References

Funding

PDF (18356KB)

28

Accesses

0

Citation

Detail

Sections
Recommended

/

〈 〉