Cable Tension and Workspace Solution of Long-span Hoisting Robot

Jiang LIU , Sheng-hai WANG , Jian LI , Yun-peng HE , Yu-qing SUN , Hai-quan CHEN

Science Technology and Engineering ›› 2024, Vol. 24 ›› Issue (10) : 4165 -4173.

PDF
Science Technology and Engineering ›› 2024, Vol. 24 ›› Issue (10) : 4165-4173 DOI: 10.12404/j.issn.1671-1815.2302577
research-article
Cable Tension and Workspace Solution of Long-span Hoisting Robot
Author information +
History +
PDF

Abstract

The catenation effect of the rope of the long-span hoisting robot is studied. Firstly, the kinematic and dynamic models of the robot were established by using the cable as linear model. Secondly, there is gravity in the cable, and the long span cable was catenary model, in order to solve the cable tension in the catenary model, the quadratic programming method was used to solve the optimal solution of cable tension. Based on the statics equation, wrench feasible workspace and wrench closure workspace of the hoisting robot were obtained. Finally, the simulation was verified by MATLAB, the simulation results show that wrench feasible workspace is smaller than wrench closure workspace. Comparing the cable length of the two models, the length of the first cable changes the most, the cable tension is small, and the cable self-weight cannot be ignored.

Cite this article

Download citation ▾
Jiang LIU, Sheng-hai WANG, Jian LI, Yun-peng HE, Yu-qing SUN, Hai-quan CHEN. Cable Tension and Workspace Solution of Long-span Hoisting Robot. Science Technology and Engineering, 2024, 24(10): 4165-4173 DOI:10.12404/j.issn.1671-1815.2302577

登录浏览全文

4963

注册一个新账户 忘记密码

References

Funding

PDF (2639KB)

16

Accesses

0

Citation

Detail

Sections
Recommended

/

〈 〉