The timing of the second layer primary support in soft rock tunnels with large deformation is crucial for controlling surrounding rock deformation. Applying it too early or too late can threaten tunnel stability and economic efficiency. Therefore, determining the optimal timing for the second layer is a core issue for engineering safety and cost control. A time-varying virtual support force was introduced to describe the spatial effect of the excavation face based on viscoelastic-plastic mechanics and combines the Nishihara model to characterize the time effect of rock mass creep. A construction mechanics model for soft rock tunnels with large deformation considering spatiotemporal effects was established. The occurrence of the viscoplastic failure zone in the surrounding rock was used as the criterion for determining the optimal timing of the second layer primary support, and an analytical solution for its optimal timing was derived. Using the Xiejiapo Tunnel Project on the Anlan Expressway as an example, this model was applied to determine that the optimal timing for the second layer primary support in the soft rock section with large deformation was after the 9th excavation advance. Numerical simulation and field monitoring results show that the analytical solution is reliable and has a significant deformation control effect, effectively avoiding support structure failure. The research results provide a theoretical basis and practical method for the design of soft rock tunnel support.
WANG Rui, LI Zhuang, DENG Xiang-hui, WU Jin, WANG Ping-an, ZHAO Bang-xuan.
Timing of Double Layer Primary Support Construction for Soft Rock Large Deformation Tunnel Considering Time and Space Effects[J].
Science Technology and Engineering, 2026, 26(12): 5241-5254 DOI:10.12404/j.issn.1671-1815.2506772
ZhengK Y, ShiC H, ZhaoQ J, et al. Support design method for deep soft-rock tunnels in non-hydrostatic high in-situ stress field[J]. Journal of Central South University, 2024, 31(7): 2431-2445.
FuHelin, YiHaidong, HuKaixun, et al. Upper bound solution of surrounding rock pressure in deep tunnel cavity considering plastic zone below tunnel[J]. Journal of Central South University(Science and Technology), 2024, 55(7): 2625-2634.
CuiGuangyao, WangXuelai, WangMingsheng. Field experimental study on large deformation control of fracture zone section of deep buried tunnel with high ground stress[J]. Journal of Geotechnical Engineering, 2019, 41(7): 1354-1360.
[6]
HuJ, HeM C, TaoZ G, et al. An overview of potential excavation compensation method for tunnelling in deep rock engineering[J]. Geomechanics and Geophysics for Geo-Energy and Geo-Resources, 2024, 10(1): 137.
[7]
LiY, ZhengJ, XuC, et al. Research on support control of new materials and structures for deep buried complex soft rock tunnel with large deformation[J]. Rock Mechanics and Rock Engineering, 2024, 58(3): 1-22.
[8]
帅远梁. 考虑蠕变特性软岩隧道二次衬砌支护时机研究[D]. 抚州: 东华理工大学, 2022.
[9]
ShuaiYuanliang. Study on the timing of secondary lining support of soft rock tunnel considering creep characteristics[D]. Fuzhou: East China University of Technology, 2022.
[10]
NieJ C, HeC, KouH, et al. Research on excavation method for soft rock tunnel based on stress release rate[J]. Applied Sciences, 2024, 14(2): 668.
XiaCaichu, TangYing, ZhuHehua, et al. Design method of double-layer primary support system for large section rock tunnel: CN201110032680.1[P]. 2011-06-01.
ChenJianxun, LiuWeiwei, ChenLijun, et al. Field test on large deformation control and reasonable support form of large-span highway tunnel in chlorite schist stratum[J]. China Highway Journal, 2020, 33(12): 212-223.
ZhangDehua, LeiKe, TanZhongsheng, et al. Comparative experimental study on bearing capacity of double-layer primary support for large deformation tunnel in soft rock[J]. Journal of Civil Engineering, 2017, 50(S2): 86-92.
YangLinlin, YangWenbo, TianHaosheng, et al. Study on deformation control of double-layer primary support of tunnel consi-dering short-term creep effect of surrounding rock[J]. Journal of Rock Mechanics and Engineering, 2023, 42(7): 1731-1742.
XieJinchi, KouHao, HeChuan, et al. Hole type and supporting time of double-layer primary support for large deformation soft rock tunnel with high insitu stress[J]. Tunnel Construction, 2022, 42(9): 1578-1588.
[21]
KouH, YangW B, HeC, et al. Model test of excavation and double primary support time for soft rock tunnel considering creep characteristics[J]. Acta Geotechnica, 2024, 19(5): 2775-2803.
LiTao, LiuRuihui, WangWanping, et al. Optimization analysis of construction timing of double-layer primary support in large-span soft rock tunnel construction[J]. Highway, 2023, 68(7): 58-62.
ZhongYoujiang, LiuShijie, WuJianhe. Application of double primary support to high geostress soft rock section of Yuntunbao Tunnel[J]. Tunnel Construction, 2020, 40(1): 90-98.
QiuRuicheng. Research on key technology of double-layer primary support for large deformation tunnel with phyllite accumulation[D]. Chengdu: Southwest Jiaotong University, 2019.
[28]
SunC H, LiZ, WuJ, et al. Research on double-layer support control for large deformation of weak surrounding rock in Xiejiapo Tunnel[J]. Buildings, 2024, 14(5): 1371.
XiaZengyin, ZhangHuijian, ChenJun, et al. Lining mechanics and countermeasures of tunnel in expansive mudstone: taking a tunnel in Inner Mongolia as an example[J]. Science Technology and Engineering, 2025, 25(12): 5164-5172.
LiuKexin, FengSichen, WangLantian, et al. Settlement and support deformation characteristics of shield tunnel passing through existing tunnels in upper soft and lower hard strata[J]. Science Technology and Engineering, 2025, 25(29): 12681-12690.
LiJunpeng. Study on the stress release law of tunnel surrounding rock and the supporting time of soft rock during excavation[D]. Xi'an: Xi'an University of Technology, 2007.
CaoRuilang, DuanQingwei, ZhaoYufei, et al. Viscoelastic-plastic solution of circular tunnel based on Hoek-Brown criterion Nishihara model[J]. Hydraulic and hydropower technology, 2017, 48(4): 64-71.
[39]
TarifardA, TörökÁ, GörögP. Review of the creep constitutive models for rocks and the application of creep analysis in geomechanics[J]. Rock Mechanics and Rock Engineering, 2024, 57: 7727-7757.
ZengYanhua, WangBo, FengKun, et al. Underground structure design principle and method[M]. Chengdu: Southwest Jiaotong University Press, 2022.
[42]
SulemJ, PanetM, GuenotA. An analytical solution for time-dependent displacements in a circular tunnel[J]. International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts, 1987, 24: 155-164.
XiaCaichu, XuChen, DuShigui. Interaction between viscoelastic-plastic surrounding rock and support of deep buried tunnel considering stress path[J]. Journal of Rock Mechanics and Engineering, 2021, 40(9): 1789-1802.
[45]
武金. 软岩大变形隧道双层初期支护施作时机研究[D]. 西安: 西安工业大学, 2024.
[46]
WuJin. Study on the construction timing of double-layer primary support for soft rock large deformation tunnel[D]. Xi'an: Xi'an Technological University, 2024.
WangYiqing, GaoMing, ChenYang, et al. Design method of wide-band optical system based on particle swarm algorithm[J]. Journal of Xi'an Technological University, 2025, 45(5): 748-757.
[49]
OresteP P. Analysis of structural interaction in tunnels using the covergence-confinement approach[J]. Tunnelling and Underground Space Technology, 2003, 18: 347-363.