摘要
建筑业智能化与工业化发展为行业转型升级提供新的思路,智能建造与装配式建筑成为促进工程建造提质增效的重要发展方向。然而,装配式建筑的智能建造能力评价方法尚未成熟,限制新型工业化建造理念与智能建造技术的推广应用。基于目标决策优化理论提出一套装配式建筑项目智能建造成熟度评价模型。首先,从技术、管理、过程维度构建了58个智能建造能力评价指标,并基于修正的Simos方法确定评价指标权重。其次,通过SMAA-TRI(stochastic multicriteria acceptability analysis-triage)方法改进ELECTRE-TRI(elimination and choice expressing reality- triage)算法用于项目成熟度等级评价与敏感性分析。案例研究结果证明,改进的ELECTRE TRI算法相对于传统方法可通过概率分布的方式更精准、科学地反映项目的智能建造成熟度水平。研究结果为建筑工业化背景下的智能建造成熟度研究提供理论借鉴,为装配式项目智能建造顶层设计、发展路径与推进策略提供实践参考。
Abstract
The intelligent and industrialized development of the construction industry has been viewed as providing new directions for industry transformation and upgrading. Intelligent construction and building industrialization have been regarded as important development directions for enhancing the quality and efficiency of engineering construction. However, the evaluation methods for the intelligent construction capability of prefabricated buildings have not yet been fully developed. The promotion and application of new industrialized construction concepts and intelligent construction technologies have therefore been constrained. An intelligent construction maturity evaluation model was proposed for prefabricated building projects based on goal decision optimization theory. First, 58 evaluation indicators for intelligent construction capability were developed from the technical, management, and process dimensions, and the weights of these indicators were determined using a modified Simos method. Second, the project maturity level was evaluated using the SMAA-TRI(stochastic multicriteria acceptability analysis-triage)and ELECTRE-TRI(elimination and choice expressing reality- triage)algorithms. The results show that the improved ELECTRE TRI algorithm can more accurately reflect the project's intelligent construction maturity level in a probabilistic distribution approach compared to traditional methods. The result provides theoretical insights for research on intelligent construction maturity and offers practical references to promote the development of intelligent construction in prefabricated projects.
LU Yu-jie, GAO Hui, WEI Wei.
Maturity Evaluation and Model Development Methods of Intelligent Construction for Prefabricated Building Projects[J].
Science Technology and Engineering, 2026, 26(11): 4800-4812 DOI:10.12404/j.issn.1671-1815.2500817
学者们在智能化宏观发展评价的基础上,建立了更为深入细致的量化指标,用于定量评估工业化与智能化发展成熟度等级。在建筑工业化方面,李珠月[7]从建造过程、行业政策、行业环境、行业效益层面建立了工业化建筑发展成熟度模型。在建筑智能化领域,学者对智能建造相关技术成熟度进行了初步探索。Underwood等[8]从流程、技术、政策三个主要方面制定了12个度量指标来计算BIM(building information modeling)成熟度;陶飞等[9]从物理实体、数字孪生模型、数字孪生数据、连接交互和功能服务五个维度将评估单元级(如机器人)及系统级(生产车间)的数字孪生技术成熟度等级。上述研究已涵盖建筑智能化、工业化等重要发展趋势的成熟度等级评价方法。然而,智能化领域多聚焦于技术成熟度研究,尚未全面探究技术、管理、过程等综合要素对智能建造发展的影响。此外,现有研究较少同时考虑工业化与智能化耦合影响下的智能建造成熟度评估。
以多种经典成熟度模型为基础,如软件能力成熟度评价模型CMMI(capability maturity model integration)、智能制造成熟度模型等,以信息技术应用水平、业务信息共享能力、智能技术应用效益为考量标准,将装配式建筑项目智能建造成熟度划分为阶梯上升的5个等级,如图2所示,表示智能建造项目逐步趋于信息化、集成化、无人化、最优化。
DingLieyun. System thinking on cultivation mode for innovative intelligent construction talents[J]. Research in Higher Education of Engineering, 2020(5): 1-4, 29.
YuanDongliang, WangZhi, RenLianwei, et al. Evaluation of application maturity of intelligent construction based on combinatorial empowerment-cloud model[J]. Science Technology and Engineering, 2024, 24(19): 8239-8247.
[7]
PanM, LinnerT, PanW, et al. A framework of indicators for assessing construction automation and robotics in the sustainability context[J]. Journal of Cleaner Production, 2018, 182: 82-95.
LiTao, LiXiaojun, XuBo, et al. Research and application of digital twin maturity model for underground engineering[J]. Journal of Tongji University (Natural Science), 2024, 52(12): 1813-1822.
GuoFengyi, LiuShiping, FuShuang, et al. Digitalization paths for aerial building machine construction technology[J]. Science Technology and Engineering, 2025, 25(9): 3480-3850.
[12]
李珠月. 基于成熟度模型的工业化建筑评价体系研究[D]. 哈尔滨: 哈尔滨工业大学, 2018.
[13]
LiZhuyue. Research on assessment of industrialized building based on maturity model[D]. Harbin: Harbin Institute of Technology, 2018.
[14]
UnderwoodJ, IsikdagU. Handbook of research on building information modeling and construction informatics[M]. Hershey: IGI Global, 2009.
TaoFei, ZhangChenyuan, QiQinglin, et al. Digital twin maturity model[J]. Computer Integrated Manufacturing Systems, 2022, 28(5): 1267-1281.
[17]
GovindanK, JepsenM B. ELECTRE: a comprehensive literature review on methodologies and applications[J]. European Journal of Operational Research, 2016, 250(1): 1-29.
WangBo, ChenJiaren, LiaoFangwei, et al. Path and policy of green and low-carbon transformation of construction industry in the context of intelligent construction[J]. Science & Technology Review, 2023, 41(5): 60-68.
ZhangYuting, CuiHan, ChenJiayu. Autonomous robots and human-robot collaboration in construction: a review[J]. Journal of Civil and Environmental Engineering, 2025, 47(5): 23-37.
LiGuoliang, ZhuEnfen, YangXiaojie, et al. Analysis on the evolution of research hotspots in intelligent construction based on CiteSpace[J]. Journal of Civil Engineering and Management, 2025, 42(1): 91-103.
[24]
TervonenT, LahdelmaR, AlmeidaD J, et al. SMAA-TRI: a parameter stability analysis method for ELECTRE TRI[C]// Environmental Security in Harbors and Coastal Areas: Management Using Comparative Risk Assessment and Multi-Criteria Decision Analysis. Berlin: Springer, 2007: 217-231.
[25]
DiasL C. Sustainability assessment using the ELECTRE TRI multicriteria sorting method[M]//Methods in Sustainability Science. Amsterdam: Elsevier, 2021: 197-214.
[26]
EdirisingheR. Digital skin of the construction site: smart sensor technologies towards the future smart construction site[J]. Engineering, Construction and Architectural Management, 2019, 26(2): 184-223.
[27]
OkeA E, ArowoiyaV A. Evaluation of internet of things (IoT) application areas for sustainable construction[J]. Smart and Sustainable Built Environment, 2021, 10(3): 387-402.
WuMeixi, YangXiaotong. Five forces of computational power: a comprehensive method to measure computational power[J]. Information and Communications Technology and Policy, 2022(3): 13-21.
ChenJunyi, LiRubing, XingXingyu, et al. Survey on intelligence evaluation of autonomous vehicles[J]. Journal of Tongji University(Natural Science)1824, 47(12): 1785-1790.
[34]
SunY, YangH, MengF. Research on an intelligent behavior evaluation system for unmanned ground vehicles[J]. Energies, 2018, 11(7): 1764.
WuYumo, ZhaoDan, YangZhenxing, et al. Research on key influencing factors of bim application utility in intelligent construction[J]. Construction Economy, 2021(11): 95-98.
ZhangYingying. Research on construction costoptimization software for prefabricated building using forward BIM[D]. Nanjing: Southeast University, 2019.
XieYalong, WangWanqi, LiuHongliang. Total quality management framework system of railway engineering based on intelligent construction[J]. Railway Technical Innovation, 2021(5): 35-41.
WangZhangqiong, ZhaoQilin, XuXiaoya, et al. Research progress on the application of artificial intelligence in building structure design[J]. Science Technology and Engineering, 2025, 25(16): 6598-6607.
ZhangXue, LiuXuexian, ZhangXiaoyan. Application of BIM technology in preliminary design phase of prefabricated construction[J]. Architecture Technology, 2021, 52(1): 4-6.
[50]
吕兴举. 基于AutoCAD的协同设计平台设计与实现[D]. 济南: 山东大学, 2016.
[51]
LüXingju. The design and implementation of the collaborative design platform based on AutoCAD[D]. Jinan: Shandong University, 2016.
[52]
沈玲玲. 基于协同模式的建筑设计管理平台的研究和实现[D]. 上海: 上海交通大学, 2019.
[53]
ShenLingling. The research and realization of architectural design management platform based on collaborative mode[D]. Shanghai: Shanghai Jiao Tong University, 2019.
[54]
KaranE, AsadiS. Intelligent designer: a computational approach to automating design of windows in buildings[J]. Automation in Construction, 2019, 102: 160-169.
ZhouChong, LiYu, ZhengYi, et al. Application of intelligent production information management system in fabricated building[J]. Construction Technology, 2020, 49(5): 46-47, 103.
LiJuan, ZouHao. Intelligent warehouse performance evaluation based on fuzzy comprehensive method[J]. Logistics Technology, 2021, 40(1): 78-82.
[59]
唐小雅. 基于甩挂运输的装配式预制构件物流调度研究[D]. 重庆: 重庆大学, 2020.
[60]
TangXiaoya. Study on logistics scheduling of prefabricated components based on drop and pull transport[D]. Chongqing: Chongqing University, 2020.
[61]
衡震. 智能混凝土开裂自监测性能及温湿度的影响[D]. 大连: 大连理工大学, 2017.
[62]
HengZhen. Self-monitoring of cracking development of smart concrete and effect of temperature and humidity[D]. Dalian: Dalian University of Technology, 2017.
[63]
王家涛. 智能化建筑电气工程的设计与应用研究[D]. 武汉: 湖北工业大学, 2017.
[64]
WangJiatao. Design and application of intelligent building electrical engineering[D]. Wuhan: Hubei University of Technology, 2017.
FuYu, ZengJing, ChenLingling. A brief analysis of software project risk management based on the software capability maturity model[J]. China CIO News, 2021(5): 46-47.
ChenWei, FuJie, XiongFugang, et al. Grey clustering evaluation model for construction safety of fabricated building project[J]. China Safety Science Journal, 2016, 26(11): 70-75.
[71]
FigueiraJ, RoyB. Determining the weights of criteria in the ELECTRE type methods with a revised Simos’ procedure[J]. European Journal Of Operational Research, 2002, 139(2): 317-326.
BianJingmei, BaiQuan. Application of simplified ELECTRE in optimal selection of construction schemes[J]. Mathematics in Practice and Theory, 2015(16): 38-43.
[74]
de AraujoM C B, AlencarL H, de Miranda motaC M. Classification model for bid/no-bid decision in construction projects[J]. International Transactions in Operational Research, 2022, 29(2): 1025-1047.
[75]
MicaleR, La FataC M, La ScaliaG. A combined interval-valued ELECTRE TRI and TOPSIS approach for solving the storage location assignment problem[J]. Computers & Industrial Engineering, 2019, 135: 199-210.