厚硬顶板宽煤柱临空巷道超前强矿压显现机制及控制
DOI:
CSTR:
作者:
作者单位:

1.北京科技大学 资源与安全工程学院;2.国家能源集团新疆能源化工有限公司 昌吉矿业分公司

作者简介:

通讯作者:

中图分类号:

TD324

基金项目:

国家重点研发计划项目(2024YFC3013803);国家自然科学基金资助项目(U24B2045)


Mechanism and control of advanced strong mine pressure in wide coal pillar roadway with thick and hard roof
Author:
Affiliation:

1.School of Resources and Safety Engineering,University of Science and Technology Beijing;2.Changji Mining Branch,CHN Energy Xinjiang Energy Co,Ltd

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对厚硬顶板-宽煤柱临空巷道回采超前区域强矿压显现问题,以新疆某矿WⅡ02040502工作面上顺槽为工程背景,采用现场调研、理论分析、数值模拟和现场监测相结合的方法,分析相邻采空区、38 m宽煤柱、厚硬顶板及工作面超前扰动共同作用下的强矿压形成机制,并提出分源协同超前卸压措施。结果表明:上顺槽3次典型强矿压显现均集中于工作面超前40~61 m范围内,破坏以煤柱侧片帮、底鼓、顶板局部下沉和支护构件受损为主;厚硬顶板悬顶传载、宽煤柱静载储能和工作面超前支承压力空间叠加,是上顺槽超前区域承载能力降低并诱发局部强矿压显现的主要机制。数值模拟表明,工作面推进过程中,典型超前应力测线峰值应力由11.17 MPa增至22.09 MPa,峰值位置主要集中于煤壁前方4~12 m;现场强矿压显现较集中的超前40~60 m范围虽非峰值区,但平均垂直应力由10.18 MPa增至13.61 MPa,长期处于峰后高静载衰减段。基于此,提出“顶板预裂切顶-煤柱释能卸压-工作面超前弱化”的分源协同超前卸压方案。现场应用后,视电阻率均值由104 Ω·m增至155 Ω·m,浅、深基点煤体应力分别降低约21.0%和57.3%,微震总能量和频次分别降低43.05%和46.26%,巷道围岩稳定性得到改善。

    Abstract:

    Aiming at the problem of strong mine pressure in the advance area of thick and hard roof-wide coal pillar gob-side entry mining, taking the crossheading of WII02040502 working face in a mine in Xinjiang as the engineering background, the formation mechanism of strong mine pressure under the combined action of adjacent goaf, 38 m wide coal pillar, thick and hard roof and advance disturbance of working face is analyzed by means of field investigation, theoretical analysis, numerical simulation and field monitoring, and the measures of advanced pressure relief with different sources are put forward. The results show that the three typical strong mine pressure behaviors in the upper crossheading are concentrated in the range of 40 ~ 61 m in advance of the working face, and the damage is mainly caused by the side spalling of the coal pillar, the floor heave, the local subsidence of the roof and the damage of the supporting components. The spatial superposition of suspended roof load transfer of thick and hard roof, static load energy storage of wide coal pillar and advanced abutment pressure of working face is the main mechanism for the reduction of bearing capacity in the advanced area of upper crossheading and the occurrence of local strong mine pressure. The numerical simulation shows that the peak stress of the typical advanced stress measurement line increases from 11.17 MPa to 22.09 MPa during the advancing process of the working face, and the peak position is mainly concentrated in the front of the coal wall 4 ~ 12 m ; although the range of 40-60 m ahead of the peak is not the peak area, the average vertical stress increases from 10.18 MPa to 13.61 MPa, which is in the post-peak high static load attenuation section for a long time. Based on this, a sub-source collaborative advanced pressure relief scheme of " roof pre-splitting roof cutting-coal pillar energy release pressure relief-working face advanced weakening " is proposed. After field application, the average value of apparent resistivity increased from 104 Ω·m to 155 Ω·m, the stress of shallow and deep base point coal decreased by about 21.0 % and 57.3 % respectively, the total energy and frequency of microseismic decreased by 43.05 % and 46.26 % respectively, and the stability of roadway surrounding rock was improved.

    参考文献
    相似文献
    引证文献
引用本文

苟仁涛,宋大钊,李振雷,等. 厚硬顶板宽煤柱临空巷道超前强矿压显现机制及控制[J]. 科学技术与工程, , ():

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2026-07-01
  • 最后修改日期:2026-08-18
  • 录用日期:2026-09-03
  • 在线发布日期:
  • 出版日期:
×
关于抵制伪造参考文献学术不端行为的声明
关于规范使用生成式人工智能的声明
喜报|《科学技术与工程》3篇论文成功入选 “第二十八届中国科协年会影响力提名论文”
2026年会通知 | “技术经济学驱动智能经济生态构建与治理变革”——中国技术经济学会第三十三届学术年会(2026)会议通知暨征文启事(第一轮)
亟待确认版面费归属稿件,敬请作者关注