路堤填筑对邻近桥梁桩基影响的两阶段分析
DOI:
作者:
作者单位:

1.河海大学岩土工程科学研究所;2.岩土力学与堤坝工程教育部重点实验室(河海大学);3.青建集团股份公司;4.昆山开发区规划建设局

作者简介:

通讯作者:

中图分类号:

TU411

基金项目:

填埋场热生成及对垃圾堆体和防渗衬垫变形强度特性影响机理,国家自然科学基金项目(面上项目,重点项目,重大项目)


Two-stage analysis of the influence of embankment filling on adjacent bridge pile foundation
Author:
Affiliation:

1.Institute of Geotechnical Engineering, Hohai University;2.Key Laboratory of Geomechanics and Embankment Engineering of Ministry of Education, Hohai University

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    人工硬壳层搅拌桩复合地基在堆载时地基土体会产生侧向位移,使临近桥梁桩基发生变形,降低稳定性。为了分析深厚软土地区路堤填筑对临近桥梁桩基影响,采用公式推导和有限元数值计算方法分析不同地基处理方式下桩身变形。基于Winkler弹性地基梁理论和两阶段分析方法,考虑土体非线性及桩身模量的影响,推导路堤填筑条件下的桩土相互作用控制方程,计算不同地基处理方式下地基土体变形导致的桩身变形和内力变化,并通过现场试验进行验证。研究结果表明:增大硬壳层厚度、硬壳层弹性模量和减小搅拌桩桩间距都有利于控制桩身变形和桩身弯矩;在路堤内部的桩基,可通过改变硬壳层厚度来控制桩身变形;在路堤边缘的桩基,可通过改变硬壳层弹性模量控制桩身变形;在路堤外部的桩基,可通过改变搅拌桩桩间距控制桩身变形。

    Abstract:

    Lateral displacement of soil will occur when the artificial hard shell mixed pile composite foundation is loaded, which will deform the pile foundation near the bridge and reduce the stability. In order to analyze the influence of embankment filling on adjacent bridge pile foundation in deep soft soil area, the pile deformation under different foundation treatment methods is analyzed by formula derivation and finite element numerical calculation method. Based on Winkler's elastic foundation beam theory and two-stage analysis method, the controlling equation of pile-soil interaction under embankment filling condition is derived, and the pile deformation and internal force changes caused by soil deformation under different foundation treatment methods are calculated, and verified by field tests. The results show that increasing the thickness of the hard shell, elastic modulus of the hard shell and decreasing the distance between the stirred piles are beneficial to controlling the pile deformation and bending moment. In the pile foundation inside the embankment, the deformation of pile body can be controlled by changing the thickness of hard shell. The pile foundation at the edge of the embankment can be controlled by changing the elastic modulus of the hard shell. The pile foundation outside the embankment can be controlled by changing the distance between the stirred piles.

    参考文献
    相似文献
    引证文献
引用本文

张坤勇,薛堂伟,郭楷文,等. 路堤填筑对邻近桥梁桩基影响的两阶段分析[J]. 科学技术与工程, , ():

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2024-11-21
  • 最后修改日期:2025-04-26
  • 录用日期:2025-05-06
  • 在线发布日期:
  • 出版日期:
×
2026年会通知 | “技术经济学驱动智能经济生态构建与治理变革”——中国技术经济学会第三十三届学术年会(2026)会议通知暨征文启事(第一轮)
亟待确认版面费归属稿件,敬请作者关注